news
News history
2021.03.27
As I was cleaning the inside, coal was found from the bottom of the ship.
It seems to be before 1929 when Le Corbusier renovated. It seems that it was processed into a round shape at that time.

2021.03.12
The water level of the Seine has finally dropped.
The city of Paris has cleaned the muddy shore.
2021.02.21
The water level of the Seine has finally dropped.
The city of Paris has cleaned the muddy shore.
2021.02.14
Flooding of the Seine.
Just three years have passed since the submergence.
Water is rising on the shore this year as well.
So far this time, we expect the water level want lower in the future.
2021.02.17
Asile Flottant Revival Exhibition in Taipei
Date: 2021/3/6 (Sat) --2021/3/28 (Sun)
Sunday-Wednesday 10: 00-19: 00
Thursday-Saturday 10: 00-20: 00
Location: Rural Castle City Lifestyle Bookstore -B1 Arts and Culture Space
Taipei City Zhongshan North Road 2nd Section 72nd Street No. 6
2021.02.09
In February, the Seine is flooding.
Although it is said to be the effect of climate change, the frequency of flooding has increased.The largest flood in the last 1910 caused flooding in the city of Paris, causing great damage.This year, the water has risen to the shore for the first time in three years since 2018.In addition to the following, many French media have mentioned Asile Flottant.
2021.01.14
In 2021, the survey started in earnest.
Concrete cores were removed at several locations on the Asile Flottant hull. After that, the deterioration status and composition of concrete will be analyzed by a specialized agency.
2020.12.02
People from related organizations in Paris gathered at Asile Flottant to confirm the field for future investigations.
The interior is about to dry out, and a crossboard for work is laid out to make it easier to walk.
2020.11. 03
As I was cleaning the inside, coal was found from the bottom of the ship.
It seems to be before 1929 when Le Corbusier renovated. It seems that it was processed into a round shape at that time.

2020.11. 01
A shortened video recording the moment of emergence has been created.
2020-10-19 © ️ photo- Nicolas Brasseur

2020.10.30
It will be the second lockdown in Paris from today, but I got permission to continue working.Mud is being discharged from the ship, and the bottom of the ship is starting to dry.

2020.10.23
The levitation work has been completed successfully, and now the mud on the bottom of the ship is discharged to the land and treated as industrial waste.
In the future, we plan to investigate the condition of the concrete on the hull.

2020.10.20
After the pump drainage was completed, Asyl Flottan returned to the surface of the Seine. On the 20th, a report of emergence was broadcast from Paris in the program of NHK morning news "Good morning Japan".

2020.10.19
It has surfaced!
2020.10.19
Pump drainage started at 9:25 am local time in Paris.
2020.10.15
Preparatory work other than pump drainage for ascent has been completed.
A construction process meeting was held and the levitation work by pump drainage was decided on the 19th to 20th as scheduled.
2020.10.07
We started the preparatory work from today.
2020.10.02
We held a briefing session on levitation work with neighboring ship owners. Everyone welcomed the emergence of Asyl Flottan and promised a cooperative response.

2020.09.16
Finally, the River Bureau and the Culture Bureau have approved the start of levitation work.

2020.09.15
The levitation construction company sent us a schedule for resuming construction. Construction will begin on October 7, and levitation work will begin on October 19-20.

2020.08.29
Negotiations have begun with the River Bureau and the Culture Bureau regarding the start of construction by ADAN as a ship owner. In addition, negotiations have begun between the people involved in Paris and the construction company to resume the surfacing work.

2020.08.11
The court has sent me a document nominated by the Japan Society for Architectural Design (ADAN) as the ship's manager. The document states that it will be valid from August 4th.
2020.07.27
Clear Paris, summer sky.
.png)
2020.07.03
A ZOOM meeting was held between the trustee selected by the court and the ADAN side, and insisted on raising the ship as soon as possible for safety.
The SAS, owned by Asyl Flottan, has been liquidated, and the final talks between the Seine River Bureau and the Paris Culture Bureau are on the shelves.
2020.06.08
We received a consultation from a court-designated trustee regarding the maintenance and management of Asyl Flottan, and responded positively to continue the withdrawal.
SAS, the owner of Asyl Flottan, has been dissolved and the final talks between the Seine River Bureau and the Paris Culture Bureau have been shelved.
2020.05.28
The company that owns Asyl Flottan has been dissolved.
In February 2018, a salvage company that carried out construction work that caused the ship to submerge was sued for unpaid expenses, and the court confirmed the dissolution of the company.
2020.05.22
Spring in Paris.
You can now see the entire Asyl Flottan. There is no movement yet.
.png)
2020.05.11
The lockdown in Paris has been unlocked.
2020.04.08
The water level of the Seine dropped and I could see the windows of Asyl Flottan.
2020.03.24
The water level of the Seine dropped a little and I could see the roof of Aile Flottant.
.png)
.jpeg)
2020.03.17
We were planning to start levitation work after various preliminary discussions next week, but the coronavirus spread and all were suspended due to the lockdown in Paris.
2020.03.13
It has been decided that final discussions with the Seine River Bureau will be held on March 20 for levitation work.Along with this, it was also decided to hold discussions with neighboring ship owners on March 27.
2020.02.27
As the rain continued and the water level of the Seine rose, the Asyl Flottan disappeared.
2020.01.22
The pier has arrived in Antwerp and is waiting for its transfer to Paris at the warehouse.
2019.11.18
Two piers donated by Japan to Azir Flottan have been completed.
The donation will be made by the stainless steel processing company Alloy. We will leave Mojiko by the end of the year and arrive in Paris next February.
.jpeg)
.png)
2019.11.11
The surfacing construction company has been decided.
After that, we will wait for the permission of the French regulatory agency, and finally we will prepare for the ascent work.
2019.05.18